Camp/Retreat Approval Checklist
November 9, 2026
Management folder | Download original checklist
What Operations needs before approval
For parish and school leadership, Mission and Faith Formation, Youth Ministry, ECDC, IT, Facilities and event leads
Please complete the items below for the locations your program will use. I need the program details, a walkthrough of the rooms and routes, and the names of the people assigned to carry out the plan. Give Operations the record references and identify anything still open before we release the event.
Every location used
- Event leads, confirm the program, operator, dates, hours, rooms and floors. Record the maximum number of participants and adults present at the same time, including any groups sharing a shelter.
- Event leads, name the director, deputy, group leaders, weather monitor and backup, medical lead, roster holder, responder greeter, guardian message sender and reunification team. Assign movement assistance and a backup for each person who needs it.
- Facilities and the building lead, record the walkthrough date, applicable room sheets, current access restrictions and any authorized temporary route. Identify the responder entrance, assembly point, reunification and pickup point. Verify that the routes and destinations will be available during the event.
- Operations and the building lead, record the shelter capacity supported by the applicable facility documentation and compare it with the combined occupancy. Record the evidence reference and resolve any capacity or access issue before release.
- IT and the event lead, record the staff radio channel or talkgroup, backup communication method and test results in the occupied rooms and shelters. Verify the weather warning method and record the alert and backup power checks.
ECDC
- Ronda and the ECDC lead, confirm which rooms and floors will be occupied. Match them to the posted fire evacuation and basement shelter sheets. Verify basement access and movement assistance for each group, including groups already on the basement level.
- Confirm how many participants and adults the basement can accommodate together and document the evidence. Walk the route to the assigned assembly and pickup points and verify the responder entrance during the program hours.
ECDC readiness form · ECDC event assignments and maps
Fletcher Hall
- Parish event leads, confirm the occupied areas and their Fletcher Hall or FLSH room sheets. Walk the marked route to the SHEC basement with Facilities and verify door access, assistance and the fire evacuation routes for the rooms in use.
- Document available capacity in the SHEC basement for all groups using it at the same time. Confirm the responder entrance, assembly and guardian pickup assignments for the event.
Fletcher Hall readiness form · Fletcher Hall event assignments and maps
Marquette 1928 Building
- Jay and the school event lead, list the rooms and floors in use. Match each to its posted evacuation sheet and shelter destination. Confirm capacity at each assigned shelter and who will assist each group.
- Facilities, confirm the current construction boundaries, available doors and stairs, responder access and any authorized temporary routes. Walk the routes with the event lead and record any corrections.
Marquette 1928 readiness form · Marquette 1928 event assignments and maps
MARQ Gym
- Jay and the gym event lead, confirm the gym and any adjoining rooms the program will use. Use the May 13, 2024 GYMNASIUM sheet on page 23 for the gym and match adjoining rooms to their own posted sheets.
- Verify access to the basement choir room, its supported capacity for all groups assigned there and communication coverage in that room. Confirm gym evacuation, assembly and pickup assignments with Facilities.
MARQ Gym readiness form · MARQ Gym event assignments and maps
Release for use
- File the location records, training attendance and demonstrated skills, equipment tests and closed corrective actions. Use references to the restricted roster, participant acknowledgments and pickup records.
- Record the approved hazard assessment and EAP revision. Identify the designated reviewer, decision, date and any conditions. Assign an owner and due date to each open item and confirm closure before release.
Chris Davenport
Director of Operational Strategy
Record the review
File the completed record
Save an editable copy, upload it to the assigned SharePoint folder, then verify the filename and record the filing reference.
Open 04 Review and Release